Site preparation is very important for a good installation. As a reminder we are not responsible for any site prep. Below are a few steps that will help with building install:
Check for underground lines, where anchoring will take place.
Land must be squared and leveled. Call for more details.
Minimum workspace of 2 ft around entire structure.
When overhead power lines are involved, a minimum of 10 ft is needed or power lines must be completely shut off.