Materials:
  1. Additional Anchoring
    Additional Anchoring
  2. Baserail
    Baserail
  3. Boxed Eve
    Boxed Eve
  4. Braces
    Braces
  5. Purlins / Hat Channels
    Purlins / Hat Channels
  6. J Trim
    J Trim
  7. L Trim
    L Trim
  8. Sheet Panels
    Sheet Panels
  9. Standard Anchors
    Standard Anchors
  10. Ridgecap Trim
    Ridgecap Trim
  11. Roll-up Door
    Roll-up Door
  12. Galvanized Steel
    Galvanized Steel
  13. Trusses/Bows
    Trusses/Bows
  14.  Vapor Barrier
    Vapor Barrier
  15.  Walk-in Doors
    Walk-in Doors
  16. Windows
    Windows
Preparing the Site:
Site preparation is very important for a good installation. As a reminder we are not responsible for any site prep. Below are a few steps that will help with building install:

  • Check for underground lines, where anchoring will take place.
  • Land must be squared and leveled. Call for more details.
  • Minimum workspace of 2 ft around entire structure.
  • When overhead power lines are involved, a minimum of 10 ft is needed or power lines must be completely shut off.